Power: Amukpe substation to experience power outage for 2 weeks- TCN

Sat, May 4, 2024
By editor
2 MIN READ

Power

The Transmission Company of Nigeria (TCN), on Saturday in Benin said that there would be power outage in its Amukpe substation for two weeks.

This is according to a statement signed by the General Manager, Public Affairs TCN Ndidi Mbah.

Mbah said the disruption would begin on May 4 and last till May 17.

The outage according to TCN, is to enable contractors have safe environment to erect two 132KV transmission towers at the substation.

The company also said d that as a result of the intending power outage, there would be no bulk power supply to Benin DisCo through the Adeje industrial, woodland, Mosogar, Sapele and Abraka feeders for the period.

“The transmission Company of Nigeria (TCN) hereby states that it will commence the erection of two (2) number 132kV transmission towers at its Amukpe Transmission Substation.

” And will equally restring a portion of the Benin-Delta and Delta-Oghara 132kV double circuit transmission lines from Saturday, May 4 to May 17, 2024.

“Consequently, Amukpe Substation will be out of power for the duration of the work.

“Also, there will be no bulk power supply to Benin DisCo through the following feeders: the Adeje, industrial  Woodland, Mosogar, Sapele and Abraka feeders.

“The outage is necessary to create a safe working environment for the contractor. Completion of the projects will put in place N-1 redundancy that would enable TCN supply bulk electricity to the substation from either the Benin or Ughelli transmission line.

“This means that when one transmission line is faulty, bulk electricity can still be received in the substation from the second line., ” Mbah said.

According to her, TCN apologises for the inconvenience electricity consumers in the substation will experience within the period.

She said that the projects would help ensure a more flexible and consistent bulk power supply through the Amukpe transmission substation when completed (NAN)

F.A

May 4, 2024

Tags:


NDPHC to build 33KV power sub-station in Plateau 

THE Niger Delta Power Holding Company (NDPHC), is set  to construct a 132/33 Kilovolts (KV) transmission substation in Shendam Local...

Read More
FG’s electricity subsidies rise 2.76% to N199.64bn in Dec — NERC

…Abuja Disco leads beneficiaries with N29bn THE Nigerian Electricity Regulatory Commission, NERC, has disclosed that electricity subsidies payable by the Federal...

Read More
Power supply restored after major outage hits Kenya, affects internet access

KENYA suffered a widespread power outage on Wednesday that affected most of the country, with electricity supply restored about six...

Read More