Shell Shuts Down 225,000 Capacity Bonga Oil Field
Tue, Mar 7, 2017 | By publisher
BREAKING NEWS, Oil & Gas
–
THE exploration and production arm of Shell in Nigeria – Shell Nigeria Exploration and Production Company Limited, SNEPCo, has announced the shutdown of Bonga oil field, its flagship facility of 225,000 barrels per day, bpd, for maintenance. Consequently, Nigeria’s oil production that ramped up to 2.1 million bpd has dipped to 1.875million bpd.
A statement by Bamidele Odugbesan, Shell’s spokesperson in Nigeria, said: “SNEPCo has commenced turnaround maintenance at Bonga, executing statutory activities that will ensure continuous optimum operations at the deepwater field which began producing in November 2005. Production from the field was shut down on March 4, 2017, and is expected to resume at the conclusion of the exercise next month. This is the fourth turnaround maintenance since Bonga began production.”
Bayo Ojulari, managing director, SNEPCo said the exercise would help ensure sustained production and reduce unscheduled production deferments. Ojulari said: “For the Bonga team, this is another opportunity to excel, having won the ‘Asset of the Year’ Award 2016 in the Shell Group, followed by runners-up in Norway and Malaysia.
“We are pleased that the award recognised the continuing collaboration towards optimum production with a focus on safety, cost and Nigerian content development which will be invaluable in the maintenance work.”
The turnaround maintenance involves inspections, recertification, testing and repair of equipment as well as engineering upgrades with Nigerian companies and subsea professionals playing key roles. A major focus is the Bonga floating, production, storage and offloading, FPSO, vessel, which is at the heart of the oil field’s operations. The FPSO has the capacity to produce 225,000 barrels of oil and 150 million standard cubic feet of gas per day, he stated. Bonga is Nigeria’s first deepwater development in depths of more than 1,000 metres, and is located 120km offshore Nigeria. SNEPCo expanded the project with further drilling of wells in Bonga Phases 2 and 3 and through a subsea tie-back that unlocked the nearby Bonga North West field in August 2014. Bonga Phase 3 achieved first oil in October 2015. Also, the shutdown will result in shortfall of revenue to the Federal Government as the royalties, taxes and levies accruable to the government would be shelved within the period of the maintenance. SNEPCo operates Bonga in partnership with Esso Exploration and Production Nigeria (Deep Water) Limited; Total E&P Nigeria Limited; and Nigerian Agip Exploration Limited under a production sharing contract with the Nigerian National Petroleum Corporation, NNPC.
— Mar 7, 2017 @ 18:18 GMT
|
Related Posts
Petrol: MRS slashes petrol price to N935/Litre nationwide, enforces compliance
… Nigerians praise Dangote-MRS partnership MRS Oil Nigeria Plc, a prominent player in the Nigerian downstream oil industry, has implemented...
Read MoreNNPC, Dangote Refinery Slash Petrol Prices to N899 Per Litre Amid Rising Competition
NNPC has reduced petrol ex-depot price to N899 per litre, sparking competition with Dangote Refinery and benefiting Nigerian consumers. The...
Read MoreFuel to sell at N935 per litre from Monday -IPMAN
THE Independent Petroleum Marketers Association of Nigeria (IPMAN), says the price of petrol will drop to N935 per litre by...
Read MoreMost Read
Subscribe to Our Newsletter
Keep abreast of news and other developments from our website.