Works minister says road projects delivery now is done with lowest cost, highest qualirt, speed
Politics
THE Minister of Works, Sen. David Umahi, says that despite the skyrocketed cost of materials in the construction industry caused by the dynamics of commodity price inflation and supply chain disruptions, the administration of President Bola Tinubu, has remained unmatched in prudence, cost effectiveness, speedy and quality delivery of road projects.
Speaking during his inspection visit to the on-going rehabilitation of Enugu – Port Harcourt dual carriageway section 4 (Aba – Port Harcourt) handled by China Civil Engineering Construction Corporation Ltd, CCECC, on April 8, 2024, the minister said that the administration of President Tinubu was committed to a diversified and sustainable economic future of Nigeria, “and this he is doing in the works sector through aggressive infrastructure development that would provide access to trade, tourism, industrialization and safety, especially along the local economic corridors.
The minister also visited the construction of a 23-span flyover bridge project at Eke-Obinagu Junction, NNPC Depot, along Enugu Abakaliki Road, Enugu State handled by Reinforced Global Resources Ltd, the rehabilitation work at the collapsed bridge site at the New Artisan Bridge near NNPC mega fillings station in Enugu handled by CCECC, the rehabilitation of Enugu-Port Harcourt Expressway Section 3, Enugu- Lokpanta handled by CGC, the Rehabilitation and Reconstruction of Enugu-Port Harcourt dual carriageway section 2 (Umuahia Tower-Aba Township Rail/ Road) in Abia State, handled by the Arab Contractors and the reconstruction of the dualized 15km section of the East-West road section III: (Eleme Junction- Onne Port in Rivers State being executed on reinforced concrete pavement like the coastal road) handled by RCC,
Reacting to a statement credited to the former Vice President of Nigeria, Atiku Abubakar on the 700km coastal road projects, the minister described the analysis he made on the coastal road project figures and the economic importance of the all-important coastal highway project as gross misrepresentation of facts, and figures and a ploy to mislead Nigerians by darkening counsel without knowledge.
“He doesn’t understand figures. I am going to run figures for him to understand, and he will understand how prudent the administration of President Tinubu has been. He will understand how prudency is taking the centre stage in this administration. The President has once queried me on the cost of on-going projects nationwide. I had to analyse every basic rate of construction materials to arrive at our unit rates. I showed it to Mr. President. He still thinks I should bring down the cost of projects.
“At the same time, the contractors are crying that I am oppressing them so much by reviewing the costs of their projects downwards. They lamented that what they were getting before, they are no longer getting it now. They cried out. But when I run the figures, Nigerians will see what this present administration is doing. So, I’m not here to run the figures now. I will do that in a press conference on my visit to Lagos from 10th April 2024 to 12th April 2024.”
On the economic importance of the coastal highway, he said: “I will tell you the economic benefits of the project and how the coastal road is tying the entire country together. It’s not tying just South-South and South- West. It is tying the North and South together. We are starting a project from Badagry to Sokoto, and we have a spur on this coastal route to that route and the African Trans Sahara Road that is passing from Enugu to Abakaliki to Ogoja to Cameroon which has a spur to the North.”.
He disclosed that the third section of the project is starting in Calabar by July 2024.
The commended the pace and quality of work on the projects he visited and harped on the need for the contractors to heed the project delivery timeline.
On the progress of work at the East – West Road section III, he said: “The reinforcement is very good, the concrete is very good, the speed is not very good, so they have to increase their speed. If RCC doesn’t increase their pace, I will take out a portion of this road and give it to another contractor. We will not want contractors to stay on a job like this 15 km dualization for two years or more.”
A.
-April 10, 2024 @ 20:36 GMT|
Related Posts
Alia approves ₦75,000 minimum wage for Benue workers
GOV. Hyacinth Alia of Benue has approved a minimum wage of ₦75,000 for workers in the state. Alia in a...
Read MoreTinubu restructures media, communication team
PRESIDENT Bola Tinubu has re-designated the positions of two recently appointed officials in the State House media and communications team...
Read MoreEnforce laws to eradicate child labour — NLC
THE Lagos State Council of the Nigeria Labour Congress (NLC) says enforcement of laws against child labour is critical to...
Read MoreMost Read
Subscribe to Our Newsletter
Keep abreast of news and other developments from our website.